EuroSea Tide Gauge Network Workshop 2021
TT HFRadar
NULL
EuroSea – Observing Networks initial Assessment (October 2020)

This Deliverable serves to present the initial situation, in terms of coordination, of the observation and thematic networks in EuroSea represented in work package 3 (WP3). The networks include the networks represented in EuroGOOS and additional ones. The study is based on a comprehensive questionnaire that was answered by all EuroSea WP3 tasks. In addition,… Read more »
EOOS Tech Forum 13 October 2020 Final Agenda
2021 EuroGOOS GA Doc O9.2 EuroGOOS SAWG Terms Of Reference
2021 EuroGOOS GA Doc F6.1.1 Candidate – Giovanni Coppini
2020 EuroGOOS EGA 7-8 Sept Full Documents Pack 26.08.2020
EuroGEOSS SDG14 breakout programme
Sopot Youth Conference 2019 Flyer
